    CU HVDC converter upgrades

  • Author

    Mortensen, K.N.

  • Author_Institution
    Great River Energy, G&T Cooperative, Elk River, MN
  • fYear
    2008
  • fDate
    20-24 July 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The CU HVDC transmission system is over twenty-five years old, and its reliable operation continues to be critical. In the last several years, three major life extension projects have been done. Experiences with these may help others facing similar challenges with aging equipment. Completing them successfully has required careful planning and project management to meet tight project schedules, particularly extremely short outages to do the actual installation and commissioning. A major project to replace the converter control equipment that was completed in 2004 will be described in detail.
  • Keywords
    HVDC power convertors; HVDC power transmission; power system management; power transmission planning; project management; CU HVDC converter; HVDC transmission system; aging equipment; project management; Aging; Automatic control; Carbon capture and storage; Control systems; HVDC transmission; Hardware; Power generation; Power system planning; Project management; Rivers; AC-DC power conversion; Aging; Analog systems; Control systems; HVDC converters; HVDC transmission; Project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1932-5517
  • Print_ISBN
    978-1-4244-1905-0
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2008.4596822
  • Filename
    4596822