DocumentCode :
2545026
Title :
Research on semiconductor wafer fabrication´s hot lots problem
Author :
Sheng-Liang, Xu ; Hui-Min, Ma ; Zhong-Lin, Huang
Author_Institution :
Economic Manage. Sch., Shanghai Dianji Univ., Shanghai, China
fYear :
2009
fDate :
21-23 Oct. 2009
Firstpage :
2131
Lastpage :
2135
Abstract :
In this paper the hot lots problem on semiconductor wafer fabrication is studied. Corresponding mathematical model whose object is to minimize the total cost of produce and transport is made. The method based on Binary Particle Swarm Optimization algorithm is proposed to solve this problem. The detailed realization of the method is illustrated, and an example is presented, the simulation results compared to solved by lingo software proves that the BPSO method is effective and stable.
Keywords :
particle swarm optimisation; production planning; semiconductor device manufacture; binary particle swarm optimization algorithm; cost minimization; hot lots problem; semiconductor wafer fabrication; Analytical models; Costs; Educational products; Educational programs; Fabrication; Mathematical model; Particle swarm optimization; Production planning; Pulp manufacturing; Semiconductor device manufacture; Binary Particle Swarm Optimization Algorithm; Hot lots problem; Semiconductor wafer fabrication;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-3671-2
Electronic_ISBN :
978-1-4244-3672-9
Type :
conf
DOI :
10.1109/ICIEEM.2009.5344225
Filename :
5344225
Link To Document :
بازگشت