DocumentCode :
2546245
Title :
Scheduling Algorithm with Respect to Resource Intermittence in Mobile Grid
Author :
Du Li-Juan ; Yu Zhen-wei
Author_Institution :
Dept. of Electron. Inf. Eng., North China Inst. of Sci. & Technol., Beijing, China
fYear :
2010
fDate :
23-25 Sept. 2010
Firstpage :
1
Lastpage :
5
Abstract :
In mobile grid environment, intermittent connectivity of mobile device brings large challenge for schedule. Based on distributed schedule model, the problem of task schedule in mobile grid is formulated. MGRR algorithm is presented for scheduling independent tasks with same length onto mobile grid with dynamic performance resources. Making use of re-scheduling and replication, the proposed algorithm does not use any prediction information on the performance of resources and adapts to intermittent connectivity of mobile resource. The MGRR algorithm´s objective function is total processor cycle consumption, which is the total number of instructions consumed for a application during schedule. At last the performance of MGRR is analyzed and the simulation result is given.
Keywords :
grid computing; mobile computing; mobile radio; scheduling; MGRR algorithm; distributed schedule model; dynamic performance resources; independent task scheduling; intermittent connectivity; mobile device; mobile grid; mobile resource; replication; rescheduling; resource intermittence; scheduling algorithm; Dynamic scheduling; Heuristic algorithms; Mobile communication; Mobile computing; Mobile handsets; Processor scheduling; Schedules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications Networking and Mobile Computing (WiCOM), 2010 6th International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-3708-5
Electronic_ISBN :
978-1-4244-3709-2
Type :
conf
DOI :
10.1109/WICOM.2010.5600181
Filename :
5600181
Link To Document :
بازگشت