• DocumentCode
    2547038
  • Title

    Flying schedule-matching descents ta explore flight crews´ perceptions oüi their load and task flexibility

  • Author

    Martin, Larry K. ; Sharma, Shantanu ; Lozito, S. ; Kaneshige, J. ; Dulchinos, V. ; Hayashi, Mariko

  • Author_Institution
    Stinger-Ghaffarian Technol. & NASA Ames Res. Center, San Jose State Univ. Res. Found., San Jose, CA, USA
  • fYear
    2012
  • fDate
    14-18 Oct. 2012
  • Firstpage
    1
  • Lastpage
    18
  • Abstract
    Slow to fast speed schemes were the hardest condition - 220kts at 25 000´ was the hardest speed reduction to achieve - Large variations from the profile increased crew workload. Most crews tried hard to achieve the clearances - Despite this, a wide variation in times to fly the routes (>;180 seconds). Training assumptions were unverified - Improved knowledge of the FMC would benefit crews in a future CMS environment. 20% variation in speeds is barely acceptable - Some big changes in speed are less acceptable than others - Poor conditions - weather, fatigue, equipment issues - would make 20% variations unacceptable - Occasionally a large change in speed is possible.
  • Keywords
    air traffic control; entry, descent and landing (spacecraft); training; clearances; crew workload; equipment issue; fatigue issue; flight crews perceptions; flying schedule-matching descents; load flexibility; speed reduction; task flexibility; training assumptions; weather issue;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Digital Avionics Systems Conference (DASC), 2012 IEEE/AIAA 31st
  • Conference_Location
    Williamsburg, VA
  • ISSN
    2155-7195
  • Print_ISBN
    978-1-4673-1699-6
  • Type

    conf

  • DOI
    10.1109/DASC.2012.6382958
  • Filename
    6382958