DocumentCode
2547038
Title
Flying schedule-matching descents ta explore flight crews´ perceptions oüi their load and task flexibility
Author
Martin, Larry K. ; Sharma, Shantanu ; Lozito, S. ; Kaneshige, J. ; Dulchinos, V. ; Hayashi, Mariko
Author_Institution
Stinger-Ghaffarian Technol. & NASA Ames Res. Center, San Jose State Univ. Res. Found., San Jose, CA, USA
fYear
2012
fDate
14-18 Oct. 2012
Firstpage
1
Lastpage
18
Abstract
Slow to fast speed schemes were the hardest condition - 220kts at 25 000´ was the hardest speed reduction to achieve - Large variations from the profile increased crew workload. Most crews tried hard to achieve the clearances - Despite this, a wide variation in times to fly the routes (>;180 seconds). Training assumptions were unverified - Improved knowledge of the FMC would benefit crews in a future CMS environment. 20% variation in speeds is barely acceptable - Some big changes in speed are less acceptable than others - Poor conditions - weather, fatigue, equipment issues - would make 20% variations unacceptable - Occasionally a large change in speed is possible.
Keywords
air traffic control; entry, descent and landing (spacecraft); training; clearances; crew workload; equipment issue; fatigue issue; flight crews perceptions; flying schedule-matching descents; load flexibility; speed reduction; task flexibility; training assumptions; weather issue;
fLanguage
English
Publisher
ieee
Conference_Titel
Digital Avionics Systems Conference (DASC), 2012 IEEE/AIAA 31st
Conference_Location
Williamsburg, VA
ISSN
2155-7195
Print_ISBN
978-1-4673-1699-6
Type
conf
DOI
10.1109/DASC.2012.6382958
Filename
6382958
Link To Document