DocumentCode :
2547212
Title :
The Kárahnjúkar 700 MWe hydro power project in NE-Iceland - Challenges during the construction and completion phase
Author :
Petursson, Guomundur
Author_Institution :
Landsvirkjun Power, Reykjavik
fYear :
2008
fDate :
20-24 July 2008
Firstpage :
1
Lastpage :
3
Abstract :
The presentation explains the basic layout of the 700 MW Karahnjukar Hydroelectric Project being constructed in north-eastern Iceland by Landsvirkjun, the National Power Company, and near to completion now. The challenges during construction, particularly the difficulties related to the extensive underground works, the Project includes extreme long headrace and access tunnels of around 75 km. The main dam construction is also explained as well as the challenging commissioning work for the generating units and the time constraints of the project. All 6 generating units are already in operation.
Keywords :
construction industry; dams; hydroelectric power stations; tunnels; access tunnels; construction; dam construction; hydro power project; Concrete; Delay; Filling; Geology; Reservoirs; Rivers; Slabs; Springs; Time factors; Water resources; Construction; hydro;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location :
Pittsburgh, PA
ISSN :
1932-5517
Print_ISBN :
978-1-4244-1905-0
Electronic_ISBN :
1932-5517
Type :
conf
DOI :
10.1109/PES.2008.4596945
Filename :
4596945