DocumentCode
2547675
Title
Modeling and Analyzing Project Performance with Timing Constraint Petri Net
Author
Yu Ruiqiang ; Huang Zhiqiu ; Wang Lin
Author_Institution
Coll. of Inf. Sci. & Technol., Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
Volume
2
fYear
2009
fDate
22-24 Jan. 2009
Firstpage
243
Lastpage
246
Abstract
Time Petri net and timed Petri net, in which transactions are constrained with time info, are widely used in task scheduling and performance analysis, whereas they are not effective enough for project performance analysis. Timing constraint Petri net (TcPN for short) is proposed in which places are endued with time delaying domain and time persisting domain simultaneously. Furthermore, all time constraints are based on global clock. Colored resource property is attached to backward flow relation for cost evaluation. The formal definition of TcPN and its firing rule are furnished. An algorithm is offered to calculate the time constraint. State class method is used for the cost space analysis. For proving its feasibility in analyzing project performance, an example is provided and variant performance problems (such as critical path, shortest period, cost control,and state space) are discussed.
Keywords
Petri nets; costing; delays; graph colouring; project management; scheduling; colored resource property; cost space analysis; global clock; project performance analysis; state class method; task scheduling; time delaying domain; timed Petri net; timing constraint Petri Net; Clocks; Costs; Delay effects; Educational institutions; Information analysis; Performance analysis; Protocols; Space technology; Time factors; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Engineering and Technology, 2009. ICCET '09. International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-3334-6
Type
conf
DOI
10.1109/ICCET.2009.32
Filename
4769597
Link To Document