DocumentCode :
2550157
Title :
Cost model based optimization of RCM group maintenance interval
Author :
Yongsheng, Bai ; Jia Xisheng ; Feng, Li
Author_Institution :
Dept. of Manage. Eng., Mech. Eng. Coll., Shijiazhuang, China
fYear :
2009
fDate :
21-23 Oct. 2009
Firstpage :
1174
Lastpage :
1178
Abstract :
For the optimization of complex system RCM tasks, the group maintenance policy is introduced, and mathematical models are established to minimize the whole maintenance cost per unit time. The cost of traditional periodic replacement and functional check considering potential failure are analyzed, respectively; integrating several types of preventive maintenance, the complex system group maintenance cost model is obtained. By the joint execution of maintenance tasks, the times and loss of system shut-down are reduced and the maintenance cost can be saved. Finally, the effectiveness of the proposed models is illustrated through a numerical example.
Keywords :
cost reduction; group technology; large-scale systems; preventive maintenance; RCM group maintenance interval; complex system; cost model based optimization; functional check cost; maintenance cost reduction; periodic replacement cost; preventive maintenance; reliability-centered maintenance; system shut-down; Cost function; Educational institutions; Engineering management; Failure analysis; Inspection; Mathematical model; Mechanical engineering; Packaging; Preventive maintenance; Timing; RCM; complex system; cost optimization; group maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-3671-2
Electronic_ISBN :
978-1-4244-3672-9
Type :
conf
DOI :
10.1109/ICIEEM.2009.5344462
Filename :
5344462
Link To Document :
بازگشت