DocumentCode
2550486
Title
Optimization of assembly line based on work study
Author
Lan, Shuang ; Wang, Xue ; Ma, Lixin
Author_Institution
Light Ind. Coll., Harbin Univ. of Commerce, Harbin, China
fYear
2009
fDate
21-23 Oct. 2009
Firstpage
813
Lastpage
816
Abstract
The target of the study is the assembly line of lamp in one company. We analyze the producing process in detail. We found that there existed some problems such as bottleneck process and unbalanced line. To solve these issues we used the MOD method in work study as well as ECRS principle. The new plan merged and simplified the entire operating process, reduced workers and increased the rate of production line balancing.
Keywords
assembling; lamps; optimisation; MOD method; assembly line; lamp; optimization; production line balancing; Assembly; Business; Continuous production; Cost benefit analysis; Educational institutions; Food industry; Inspection; Investments; Production systems; Time measurement; Assembly Line; ECRS Principle; MOD Method; Work Study;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-3671-2
Electronic_ISBN
978-1-4244-3672-9
Type
conf
DOI
10.1109/ICIEEM.2009.5344476
Filename
5344476
Link To Document