DocumentCode
2551025
Title
A new approach for accurate estimation of capacity benefit margin (CBM)
Author
Rahman, N.B.A. ; Othman, Muhammad Murtadha ; Musirin, Ismail ; Mohamed, Azah ; Hussain, Aini
Author_Institution
Eng. Centre, Univ. Malaysia Perlis, Kangar, Malaysia
fYear
2010
fDate
15-17 June 2010
Firstpage
1
Lastpage
6
Abstract
In recent years, there are several methods developed to compute the CBM. However, the methodologies do not consider the reliability of an interconnected system in the CBM determination. This paper presents the computation of CBM considering the reliability of an interconnected system. It is important to consider the reliability of an interconnected system in the CBM determination because the interconnected system is used as a medium in transferring the power to an area in order to overcome the deficiency of generation reliability. The modified IEEE 24-bus Reliability Test System (RTS) is used to demonstrate the effectiveness of the proposed method.
Keywords
power system interconnection; power system reliability; IEEE 24 bus reliability test system; accurate estimation; capacity benefit margin; generation reliability; interconnected system reliability; Capacity planning; Equations; Interconnected systems; Mathematical model; Power system reliability; Probability; Reliability; Available transfer capability; capacity benefit margin; reliability of interconnected system;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent and Advanced Systems (ICIAS), 2010 International Conference on
Conference_Location
Kuala Lumpur, Malaysia
Print_ISBN
978-1-4244-6623-8
Type
conf
DOI
10.1109/ICIAS.2010.5716172
Filename
5716172
Link To Document