• DocumentCode
    2554872
  • Title

    Study on scheduling model and algorithm for inventory control of cold rolling line

  • Author

    Zhao, Jun ; Wang, Wei ; Lou, Fangjie ; Zhan, Zili ; Liu, Na

  • Author_Institution
    Sch. of Control Sci. & Eng., Dalian Univ. of Technol., Dalian, China
  • fYear
    2011
  • fDate
    21-25 June 2011
  • Firstpage
    118
  • Lastpage
    123
  • Abstract
    Considering the characteristics of cold rolling line, which is with a large number of product categories and complex production flow, the continuity of whole cold rolling line is mainly considered to establish an optimal scheduling model in this study on the basis of maintaining the order due time and the inventory control. A heuristic algorithm for solving the proposed scheduling model is designed, which adopts a reasonable combination between Tabu search and simulated annealing algorithm. For verifying the proposed model and its corresponding hybrid algorithm, the practical production data coming from Shanghai Baosteel Co. Ltd., China have been employed to implement the simulations. And the experiments results show that the proposed model and algorithm obtains remarkable effectiveness.
  • Keywords
    cold rolling; production control; scheduling; search problems; simulated annealing; stock control; Shanghai Baosteel Co. Ltd; Tabu search; cold rolling line; complex production flow; heuristic algorithm; hybrid algorithm; inventory control; optimal scheduling model; production data; simulated annealing algorithm; Algorithm design and analysis; Coils; Job shop scheduling; Manufacturing; Mathematical model; Optimal scheduling; Cold rolling line; Heuristics; Inventory control; Production scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation (WCICA), 2011 9th World Congress on
  • Conference_Location
    Taipei
  • Print_ISBN
    978-1-61284-698-9
  • Type

    conf

  • DOI
    10.1109/WCICA.2011.5970712
  • Filename
    5970712