• DocumentCode
    2555018
  • Title

    Research on the pantograph performance evaluation criterion of B3 high-speed train

  • Author

    Guoqiang Cai ; Yu Liang ; Xiao Ming ; Yang

  • Author_Institution
    State Key Lab. of Rail Traffic Control & Safety, Beijing Jiaotong Univ., Beijing, China
  • fYear
    2010
  • fDate
    16-18 April 2010
  • Firstpage
    511
  • Lastpage
    516
  • Abstract
    The suitability of catenary directly affects the performance of current collecting between the pantogragh and catenary, in a general way whether the catenary has large unsuitability, namely hard spot, is depended on which if the maximum associated with the vertical impact acceleration of pan-head within each segment is larger than a given threshold, it will be calculated by fuzzy c-mean algorithm. Linear regression is used to equal the speed, which eliminates the influence of speed on the maximum associated with the vertical impact acceleration of pan-head. The result shows that threshold of the hard spot calculated by FCM algorithm is reasonable.
  • Keywords
    pantographs; performance evaluation; regression analysis; B3 high speed train; FCM algorithm; catenary; fuzzy c-mean algorithm; hard spot; linear regression; pantograph performance evaluation; Acceleration; Clustering algorithms; Equations; Fault detection; Laboratories; Linear regression; Partitioning algorithms; Rail transportation; Railway electrification; Traffic control; catenary; fuzzy c-mean algorithm; hard spot; linear regression; threshold;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management and Engineering (ICIME), 2010 The 2nd IEEE International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-5263-7
  • Electronic_ISBN
    978-1-4244-5265-1
  • Type

    conf

  • DOI
    10.1109/ICIME.2010.5478125
  • Filename
    5478125