DocumentCode
2558382
Title
Use of dielectric tests as an aid for hydro generator maintenance
Author
Audoli, Alain ; Merigot, Claudette
Author_Institution
Service de la Production Hydraulique, Electricite de France, Grenoble, France
fYear
1990
fDate
3-6 Jun 1990
Firstpage
379
Lastpage
382
Abstract
A broad overview of tests performed as part of hydroelectric generator monitoring/maintenance at Electricite de France is provided. Special attention is devoted to dielectric testing of stator winding insulation. More than 30 years experience at the Hydropower Generation Division resulted in the adoption of a procedure for maintenance by periodic testing. These tests, organized according to three levels of periodicity and contents which can be adapted, allow detection and monitoring of mechanical, electrical, thermal, and dielectric damage. On the basis of this information, especially the dielectric tests, objectives in terms of production facility lifetime and availability, as well as optimization of maintenance costs, have been achieved successfully on over 1200 machines in service by implementing maintenance adapted to the equipment
Keywords
hydroelectric generators; insulation testing; machine insulation; machine testing; maintenance engineering; monitoring; stators; Electricite de France; dielectric damage; dielectric tests; hydro generator maintenance; hydroelectric generator monitoring; periodic testing; stator winding insulation; Dielectric devices; Dielectrics and electrical insulation; Hydroelectric power generation; Hydroelectric-thermal power generation; Insulation testing; Life testing; Monitoring; Performance evaluation; Power generation; Stator windings;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Insulation, 1990., Conference Record of the 1990 IEEE International Symposium on
Conference_Location
Toronto, Ont.
ISSN
1089-084X
Type
conf
DOI
10.1109/ELINSL.1990.109778
Filename
109778
Link To Document