Title :
Supply chain driven - advanced taget delivery system
Author :
Lee, Yih-Yi ; Fan, N.N.
Keywords :
Business process re-engineering; Control systems; Delay; Dispatching; Foundries; Job shop scheduling; Manufacturing; Production; Semiconductor device manufacture; Supply chains;
Conference_Titel :
Semiconductor Manufacturing Technology Workshop Proceedings, 2004
Print_ISBN :
0-7803-8469-5
DOI :
10.1109/SMTW.2004.1393704