Title : 
Project scheduling using state-based probabilistic decision networks
         
        
            Author : 
Ioannou, Photios G. ; Martinez, Julio C.
         
        
            Author_Institution : 
Dept. of Civil & Enivron. Eng., Michigan Univ., Ann Arbor, MI, USA
         
        
        
        
        
        
            Abstract : 
The paper presents probabilistic CPM scheduling using an add-on program to the STROBOSCOPE simulation system that allows dependence and correlation between activity durations as well as control over precedence and the selection of paths. Activity durations and sequencing can be defined in terms of the dynamic information that becomes available as a project evolves and includes the actual start date and duration of activities already started. An example highway project illustrates the modeling power of this approach
         
        
            Keywords : 
civil engineering computing; critical path analysis; decision diagrams; digital simulation; probability; scheduling; STROBOSCOPE simulation system; activity durations; add-on program; dependence; dynamic information; highway project; modeling power; probabilistic CPM scheduling; project scheduling; start date; state based probabilistic decision networks; Civil engineering; Computer languages; Costs; Dynamic scheduling; Multiuser detection; Probability distribution; Road transportation; Uncertainty; Vehicle dynamics; Vehicles;
         
        
        
        
            Conference_Titel : 
Simulation Conference Proceedings, 1998. Winter
         
        
            Conference_Location : 
Washington, DC
         
        
            Print_ISBN : 
0-7803-5133-9
         
        
        
            DOI : 
10.1109/WSC.1998.745992