DocumentCode
2568308
Title
Infrastructure requirements for selected management practices
Author
Satir, Ahmet
Author_Institution
Dept. of Decision Sci. & Manage. Inf. Syst., Concordia Univ., Montreal, Que., Canada
fYear
1996
fDate
18-20 Aug 1996
Firstpage
600
Lastpage
604
Abstract
Three management practices (Business Process Reengineering, Total Quality Management and Just in-Time) are revised in the context of a proposed business mission and operating paradigm for production enterprises. The infrastructure requirements for these practices are presented with respect to macro, operational and organizational requirements
Keywords
production control; quality control; stock control; systems analysis; systems re-engineering; business process reengineering; infrastructure requirements; just in-time; operating paradigm; operational requirements; organizational requirements; production enterprises; total quality management; Business process re-engineering; Cost function; Delay; Hardware; Logistics; Production; Supply chain management; Supply chains; Technology management; Total quality management;
fLanguage
English
Publisher
ieee
Conference_Titel
Engineering and Technology Management, 1996. IEMC 96. Proceedings., International Conference on
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-3552-X
Type
conf
DOI
10.1109/IEMC.1996.547887
Filename
547887
Link To Document