• DocumentCode
    2572357
  • Title

    Integrated design and assembly planning

  • Author

    Reinhart, G. ; Woenckhaus, C. ; Reinhrt, G. ; Milberg, J.

  • Author_Institution
    Inst. for Machine Tools & Ind. Eng., Tech. Univ. Munchen, Germany
  • fYear
    1994
  • fDate
    10-12 Oct 1994
  • Firstpage
    47
  • Lastpage
    52
  • Abstract
    This paper discusses an approach to reduce development times in design, assembly planning and assembly. This is done by the development of synchronized organization forms, powerful software tools and a flexible assembly system. After a short introduction the current situation is described. From this the most important targets are derived and finally a specific solution is presented
  • Keywords
    assembling; computer aided production planning; flexible manufacturing systems; product development; software tools; development times; flexible assembly system; integrated design and assembly planning; powerful software tools; synchronized organization forms; Assembly; Costs; Industrial engineering; Machine tools; Manufacturing automation; Power system planning; Product development; Production; Productivity; Software tools;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Integrated Manufacturing and Automation Technology, 1994., Proceedings of the Fourth International Conference on
  • Conference_Location
    Troy, NY
  • Print_ISBN
    0-8186-6510-6
  • Type

    conf

  • DOI
    10.1109/CIMAT.1994.389095
  • Filename
    389095