• DocumentCode
    2573167
  • Title

    Impact of the delay of subcontracting in a context of integrated maintenance: analytical approach

  • Author

    Dahane, Mohammed ; Clementz, Christian ; Rezg, Nidhal

  • Author_Institution
    UFR MIM, Metz
  • fYear
    2007
  • fDate
    25-28 Sept. 2007
  • Firstpage
    273
  • Lastpage
    279
  • Abstract
    In this article we treat the problem of the delay of subcontracting and its impact on a system controlled by a policy joining the production and maintenance management. We will study a system made up of a machine M which can break down in a random way, and on which we carry out actions of corrective maintenance of random durations. Indeed, each interval T the machine is subject of actions of preventive maintenance. The system is provider of subcontracting services defined as periodic tasks in each cycle T, during which the machine is allocated to produce for a third party. Our objective is to study analytically this system, and determine the expression of the overcost generated by a delay of subcontracting.
  • Keywords
    delays; preventive maintenance; production management; subcontracting; corrective maintenance; integrated maintenance; machine break down; maintenance management; periodic task; preventive maintenance; production management; subcontracting delay; subcontracting services; Companies; Contracts; Control systems; Delay; Industrial relations; Machinery production industries; Manufacturing industries; Preventive maintenance; Production systems; Subcontracting;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 2007. ETFA. IEEE Conference on
  • Conference_Location
    Patras
  • Print_ISBN
    978-1-4244-0825-2
  • Electronic_ISBN
    978-1-4244-0826-9
  • Type

    conf

  • DOI
    10.1109/EFTA.2007.4416778
  • Filename
    4416778