DocumentCode
2573432
Title
A linear programming based heuristic for solving a two-stage flowshop scheduling problem
Author
Figielska, Ewa
Author_Institution
Warsaw Sch. of Comput. Sci., Warsaw
fYear
2007
fDate
25-28 Sept. 2007
Firstpage
392
Lastpage
397
Abstract
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines and renewable resources at each stage. The resource requirements are of 0-1 type. The objective is the minimization of makespan. The problem is NP-hard. Heuristic algorithms using linear programming are proposed for solving this problem. Performance of the heuristic algorithms is analyzed by comparing heuristic solutions with the lower bound on the optimal makespan. The results of a computational experiment show that the proposed algorithms are able to produce good solutions in short computation time.
Keywords
linear programming; processor scheduling; NP-hard problem; heuristic algorithms; linear programming; parallel unrelated machines; preemptive scheduling; resource requirements; two-stage flowshop scheduling problem; Algorithm design and analysis; Chemical industry; Concurrent computing; Heuristic algorithms; Job shop scheduling; Linear programming; Parallel machines; Performance analysis; Processor scheduling; Textile industry;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technologies and Factory Automation, 2007. ETFA. IEEE Conference on
Conference_Location
Patras
Print_ISBN
978-1-4244-0825-2
Electronic_ISBN
978-1-4244-0826-9
Type
conf
DOI
10.1109/EFTA.2007.4416794
Filename
4416794
Link To Document