• DocumentCode
    2574267
  • Title

    Minimizing the earliness-tardiness costs on a single machine

  • Author

    Rebai, Maher ; Kacem, Imed

  • Author_Institution
    ICD-LOSI CNRS FRE 2848, Univ. de Technol. de Troyes, Troyes
  • fYear
    2008
  • fDate
    June 30 2008-July 2 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper deals with the problem of scheduling a given set of independent jobs on a single machine to minimize the sum of early and tardy costs without considering machine idle time. Jobs have distinct due dates and processing times with earliness and tardiness costs. The problem is proved to be NP-hard (K.R. Baker and G.D. Scudder, 1990). A mixed integer programming formulation for the problem is presented and a lower bound is obtained by the linear relaxation. A branch and bound algorithm is developed incorporating this lower bound and an upper bound proposed by George Lie (1997). Finally, computational experiments on problems with up to 25 jobs are discussed.
  • Keywords
    computational complexity; integer programming; single machine scheduling; tree searching; NP-hard; branch-and-bound algorithm; earliness-tardiness costs; linear relaxation; mixed integer programming formulation; processing times; single machine; Computer industry; Costs; Dynamic programming; Job production systems; Job shop scheduling; Linear programming; Mixed integer linear programming; Processor scheduling; Single machine scheduling; Upper bound;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Systems and Service Management, 2008 International Conference on
  • Conference_Location
    Melbourne, VIC
  • Print_ISBN
    978-1-4244-1671-4
  • Electronic_ISBN
    978-1-4244-1672-1
  • Type

    conf

  • DOI
    10.1109/ICSSSM.2008.4598495
  • Filename
    4598495