Title :
Two-stage supply chain scheduling with an option of outsourcing in stage one
Author :
Qi, Xiangtong
Author_Institution :
Dept. of Ind. Eng. & Logistics Manage., Hong Kong Univ. of Sci. & Technol., Hong Kong
fYear :
2008
fDate :
June 30 2008-July 2 2008
Firstpage :
1
Lastpage :
6
Abstract :
This paper studies a two-stage supply chain scheduling problem with n job orders where each job needs two sequential operations. In addition to the two in-house machines each for one operation, the manufacturer has another option of outsourcing some stage-one operations to an outside subcontractor. The jobs with their stage-one operation outsourced are subject to a single batch delivery from the subcontractor before their respective stage-two operations can be started in-house. The problem is to design an integrated scheduling that considers both the in-house production and the outsourcing with the aim of optimally balancing the outsourcing cost and the makespan. The problem is NP-hard. We have developed a heuristic algorithm to solve the problem, and conducted computational experiments to validate our model and algorithm.
Keywords :
batch processing (industrial); computational complexity; costing; scheduling; supply chain management; NP-hard problem; batch delivery; heuristic algorithm; in-house production machine; job order; outsourcing option cost; subcontracting; two-stage supply chain scheduling; Costs; Job production systems; Job shop scheduling; Manufacturing; Outsourcing; Processor scheduling; Single machine scheduling; Subcontracting; Supply chains; Transportation; outsourcing; scheduling; supply chain;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Service Systems and Service Management, 2008 International Conference on
Conference_Location :
Melbourne, VIC
Print_ISBN :
978-1-4244-1671-4
Electronic_ISBN :
978-1-4244-1672-1
Type :
conf
DOI :
10.1109/ICSSSM.2008.4598552
Filename :
4598552
Link To Document :
بازگشت