Abstract :
Wind power projects in Croatia are in commencement but are also being demanded on a larger scale in the recent few years. However, Croatian transmission system operator (TSO) has many problems with the quantity of capacity asked for grid connection resulting in many places with large scale line congestion, especially in 110 kV network. In many places grid is not ready for such big penetration of intermittent power which was proven with many load flow analysis carried by system operator. In this paper one example of two different developers asking for grid connection on the same 110 kV line is presented. Also, current and future states of network are analyzed. Main problems are detected and measures for grid integration of both wind power plants are suggested.
Keywords :
load flow; power grids; wind power plants; Croatian transmission system operator; congested line; grid integration; load flow analysis; voltage 110 kV; wind power plants; Hydrology; Large-scale systems; Load flow; Load flow analysis; Power generation; Power system security; Power systems; Production; Wind energy; Wind farms; grid integration; line congestion; load flow; system operator; wind power;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
EUROCON 2009, EUROCON '09. IEEE
Conference_Location :
St.-Petersburg
Print_ISBN :
978-1-4244-3860-0
Electronic_ISBN :
978-1-4244-3861-7
Type :
conf
DOI :
10.1109/EURCON.2009.5167693
Filename :
5167693
Link To Document :
بازگشت