DocumentCode
2582442
Title
A dynamic scheduling algorithm for time- and resource-constrained task networks
Author
Hao, Qi ; Xue, Yunjiao ; Wang, Shuying ; Shen, Weiming
Author_Institution
Centre for Comput.-assisted Constr. Technol., Nat. Res. Council Canada, London, ON, Canada
fYear
2009
fDate
11-14 Oct. 2009
Firstpage
4402
Lastpage
4407
Abstract
The resource-constrained project scheduling problem (RCPSP) is an extensively explored area. The existing RCPSP approaches tend to focus on single project scheduling problems without practical support to address the multiple project schedule coordination which involves constraints defined across projects. This paper extends RCPSP by involving time and resource constraints and proposes a practical dynamic task network scheduling algorithm. This algorithm takes time constraints, resource constraints, and particularly the dynamic task execution status into consideration. Dynamic scheduling through a partial task network is considered a unique feature of this algorithm. The proposed algorithm is fully implemented and tested in a web-based aircraft inspection maintenance management system.
Keywords
scheduling; aircraft inspection maintenance management system; dynamic scheduling; resource-constrained project scheduling problem; task networks; time-constrained task networks; Aircraft; Dynamic scheduling; Heuristic algorithms; Inspection; Job shop scheduling; Maintenance; Processor scheduling; Scheduling algorithm; System testing; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2009. SMC 2009. IEEE International Conference on
Conference_Location
San Antonio, TX
ISSN
1062-922X
Print_ISBN
978-1-4244-2793-2
Electronic_ISBN
1062-922X
Type
conf
DOI
10.1109/ICSMC.2009.5346931
Filename
5346931
Link To Document