DocumentCode :
2583620
Title :
A constraint-based model for multi-objective repair planning
Author :
Barba, I. ; Valle, C. Del ; Borrego, D.
Author_Institution :
Dpto. Lenguajes y Sist. Informaticos, Univ. de Sevilla, Sevilla, Spain
fYear :
2009
fDate :
22-25 Sept. 2009
Firstpage :
1
Lastpage :
8
Abstract :
This work presents a constraint based model for the planning and scheduling of disconnection and connection tasks when repairing faulty components in a system. Since multi-mode operations are considered, the problem involves the ordering and the selection of the tasks and modes from a set of alternatives, using the shared resources efficiently. Additionally, delays due to change of configurations and transportation are considered. The goal is the minimization of two objective functions: makespan and cost. The set of all feasible plans are represented by an extended And/Or graph, that embodies all of the constraints of the problem, allowing non reversible and parallel plans. A simple branch-and-bound algorithm has been used for testing the model with different combinations of the functions to minimize using the weighted-sum approach.
Keywords :
process planning; scheduling; tree searching; branch-and-bound algorithm; connection task scheduling; constraint-based model; disconnection task scheduling; multi-mode operations; multi-objective repair planning; weighted-sum approach; Added delay; Artificial intelligence; Constraint optimization; Cost function; Personnel; Process planning; Scheduling algorithm; Testing; Time factors; Transportation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Emerging Technologies & Factory Automation, 2009. ETFA 2009. IEEE Conference on
Conference_Location :
Mallorca
ISSN :
1946-0759
Print_ISBN :
978-1-4244-2727-7
Electronic_ISBN :
1946-0759
Type :
conf
DOI :
10.1109/ETFA.2009.5347038
Filename :
5347038
Link To Document :
بازگشت