DocumentCode :
2589561
Title :
Modifying an existing preheater system for improved productivity and efficiency [cement industry]
Author :
Alesi, Shane K.
fYear :
1990
fDate :
22-24 May 1990
Firstpage :
389
Lastpage :
405
Abstract :
The most common problem facing plant operators is the inability to increase clinker production due to limiting preheater fan capabilities. Preheater fan replacement is a very costly and time consuming alternatives. The author deals with alternatives to replacing the preheater fan. These alternatives include modifying the preheater tower for increases in clinker production and improved preheater operating efficiencies
Keywords :
cement industry; cement industry; clinker production; efficiency; preheater system; productivity; Cement industry; Costs; Marketing and sales; Personnel; Poles and towers; Production systems; Productivity;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cement Industry Technical Conference, 1990., XXXII, Record of Conference Papers., IEEE
Conference_Location :
Tarpon Springs, FL
ISSN :
1079-9931
Type :
conf
DOI :
10.1109/CITCON.1990.111064
Filename :
111064
Link To Document :
بازگشت