Economic Benefit Comparison between Series FACTS Device Installation and New Transmission Line Investment in the Deregulated Power System using Probabilistic Method
Author
Attaviriyanupap, Pathom ; Yokoyama, Akihiko
Author_Institution
Dept. of Electr. & Electron. Eng., Tokyo Inst. of Technol.
fYear
2006
fDate
11-15 June 2006
Firstpage
1
Lastpage
7
Abstract
Economic benefit of installing a static synchronous series compensator (SSSC) has been evaluated and compared to that of adding a new transmission line for the modified IEEJ East standard model system. The equipment availability and load variations are included probabilistically, and the evaluation has been made in terms of the energy generation bid cost in the deregulated spot market and the investment cost For the model system, the evaluation has favored the installation of a SSSC compared with adding a new transmission line. SSSC applications to other systems can be evaluated similarly
Keywords
flexible AC transmission systems; installation; power markets; power transmission economics; power transmission lines; probability; static VAr compensators; IEEJ East standard model system; SSSC; deregulated power system; probabilistic method; series FACTS device installation; static synchronous series compensator; transmission line investment; Costs; Environmental economics; Investments; Load flow; Power generation; Power generation economics; Power system economics; Power system modeling; Power systems; Power transmission lines; Deregulation; Electricity market; FACTS devices; Power system; Probabilistic method; Static Synchronous Series Compensator; Transmission system;
fLanguage
English
Publisher
ieee
Conference_Titel
Probabilistic Methods Applied to Power Systems, 2006. PMAPS 2006. International Conference on
Conference_Location
Stockholm
Print_ISBN
978-91-7178-585-5
Type
conf
DOI
10.1109/PMAPS.2006.360331
Filename
4202343
Link To Document