Utility companies would like to provide power without interruption to any of their customers. The degree to which this goal is accomplished is considered. Both rules of thumb and the engineers´ experience were the keystones in designing and establishing the reliability of transmission systems. The paper presents an alternative to educated guess work. Designs and modifications of transmission systems can be evaluated by modeling the transmission systems based on the laws of probability
Keywords
power system reliability; power transmission lines; reliability theory; customers; designs; engineers experience; frequency-duration method; interruption; modeling; modifications; overloads; probability; reliability analysis; rules of thumb; transmission system; utility companies; Circuit breakers; Design engineering; Equations; Frequency; Power engineering and energy; Power system reliability; Reliability engineering; Thumb; Transformers; Transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
System Theory, 1995., Proceedings of the Twenty-Seventh Southeastern Symposium on
Conference_Location
Starkville, MS
ISSN
0094-2898
Print_ISBN
0-8186-6985-3
Type
conf
DOI
10.1109/SSST.1995.390615
Filename
390615
Link To Document