Title
Cross-substation short term load forecasting using support vector machine
Author
Pahasa, Jonglak ; Theera-Umpon, Nipon
Author_Institution
Dept. of Electr. Eng., Naresuan Univ. Phayao, Phayao
Volume
2
fYear
2008
fDate
14-17 May 2008
Firstpage
953
Lastpage
956
Abstract
This paper investigates the behavior of a short term load forecasting system in the cross-substation scheme. The proposed forecasting system is based on the support vector machine with the input features of past loads and temperature. It is trained with the data from one substation and tested on the blind-test data from other substations. A set of real-world data from 4 substations in Bangkok, i.e., Bangkok Noi, North Bangkok, South Thonburi and Rangsit, is used in the experiments. The results show that the similarities of the daily loadpsilas amplitude ranges and patterns of the training substations and the test substations is required to perform the cross-substation forecasting. This observation is beneficial to the model development in that the retraining stage at a new substation may be omitted if the similarities are obeyed.
Keywords
load forecasting; power engineering computing; substations; support vector machines; Bangkok; blind-test data; cross-substation short term load forecasting; load amplitude ranges; support vector machine; Demand forecasting; Expert systems; Load forecasting; Predictive models; Risk management; Substations; Support vector machines; Temperature; Testing; Weather forecasting; Short-term load forecasting; cross-substation forecasting; support vector machine; support vector regression;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology, 2008. ECTI-CON 2008. 5th International Conference on
Conference_Location
Krabi
Print_ISBN
978-1-4244-2101-5
Electronic_ISBN
978-1-4244-2102-2
Type
conf
DOI
10.1109/ECTICON.2008.4600589
Filename
4600589
Link To Document