Title : 
Electromagnetic compatibility design management challenges on Downtown Line (DTL) project
         
        
            Author : 
Chu, Michael ; Boon Toon Loi
         
        
            Author_Institution : 
Syst. Assurance & Integration Div., Land Transp. Authority, Singapore, Singapore
         
        
        
        
        
        
            Abstract : 
As modern railways deploy more complex and sensitive equipment, railway systems are increasingly vulnerable to electromagnetic interference. Effective Electromagnetic Compatibility (EMC) management is an important integral part of project management in ensuring successful delivery of railway projects. This paper highlights some challenges faced by Land Transport Authority (LTA) in the management of EMC during the DTL project design stage. To effectively address and resolve these challenges, strategy and methodology for future new projects design stage EMC management are revised and adopted.
         
        
            Keywords : 
design engineering; electromagnetic compatibility; electromagnetic interference; project management; railway electrification; DTL project design stage; EMC management; LTA; Land Transport Authority; downtown line project; electromagnetic compatibility design management challenges; electromagnetic interference; railway projects; railway systems; Agricultural machinery; Electromagnetic compatibility;
         
        
        
        
            Conference_Titel : 
Electromagnetic Compatibility (APEMC), 2012 Asia-Pacific Symposium on
         
        
            Conference_Location : 
Singapore
         
        
            Print_ISBN : 
978-1-4577-1557-0
         
        
            Electronic_ISBN : 
978-1-4577-1558-7
         
        
        
            DOI : 
10.1109/APEMC.2012.6238020