Research on the responsibility distribution of AGC adjustment in interconnected power system
Author
Xue-Feng, Li ; Le, Liu ; Wei-dong, Li
fYear
2009
fDate
6-7 April 2009
Firstpage
1
Lastpage
5
Abstract
In order to take full advantage of interconnected power system, a new distribution mode of AGC adjustment responsibility is proposed to pursue better frequency quality. Under this distribution mode, various areas AGC can adjust the entire electrical network power together according to the proportion to the same direction the load variety, regardless of whether the load change occurs in the home area or outside area. And a set of mode is constructed to recognize and differentiate the system different situations and the degrees of hazard to get different AGC adjustment responsibility assignment system. So in the different situation the system have the corresponding AGC control plan, which can reduce the AGC unit useless adjustment to improve the frequency quality. The simulation example indicates that the proposed allocation mode is helpful in the improvement of the frequency quality and system frequency control performance.
Keywords
frequency control; power generation control; power system interconnection; AGC adjustment; automatic generation control; electrical network; frequency quality; hazard degrees; interconnected power system; responsibility distribution; system frequency control; Control systems; Frequency control; Hazards; Power system control; Power system interconnection; Power system modeling; Power system restoration; Power system security; Power system simulation; Power systems; automatic generation control (AGC); distribution model;
fLanguage
English
Publisher
ieee
Conference_Titel
Sustainable Power Generation and Supply, 2009. SUPERGEN '09. International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-4934-7
Type
conf
DOI
10.1109/SUPERGEN.2009.5347937
Filename
5347937
Link To Document