DocumentCode :
2601880
Title :
Multi-resource constrained discrete time/cost trade-off problem and its improved genetic algorithm
Author :
Jing-wen, Zhang ; Hui-fang, Shan
Author_Institution :
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
fYear :
2010
fDate :
24-26 Nov. 2010
Firstpage :
123
Lastpage :
128
Abstract :
The discrete time/cost trade-off problem (DTCTP) only focuses on renewable or nonrenewable resource-constraints separately, this paper extends the DTCTP to a new multi-resource constrained discrete time/cost trade-off problem (MRCDTCTP), which involves multiple renewable and nonrenewable resource-constraints simultaneously. The objective is to minimize the project total cost under the contract duration, the total cost includes direct cost of renewable and nonrenewable resources, indirect cost, lateness penalty and earliness bonus. An improved genetic algorithm for solving MRCDTCTP is developed and its effectiveness is verified by making computation experiments. The results indicate both total cost and duration of project can be optimized, which is different from that in classical DTCTP. Conclusions from MRCDTCTP provide contractors with a new thinking view when they balance duration and cost of projects.
Keywords :
costing; genetic algorithms; project management; scheduling; MRCDTCTP; genetic algorithm; multiresource constrained discrete time-cost trade-off problem; project costing; project scheduling; renewable resource-constraints; total cost; Algorithm design and analysis; Contracts; Encoding; Heuristic algorithms; Optimization; Scheduling; Time factors; discrete time/cost trade-off; improved genetic algorithm; multi-resource constraints; project scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management Science and Engineering (ICMSE), 2010 International Conference on
Conference_Location :
Melbourne, VIC
ISSN :
2155-1847
Print_ISBN :
978-1-4244-8116-3
Type :
conf
DOI :
10.1109/ICMSE.2010.5719794
Filename :
5719794
Link To Document :
بازگشت