Time-cost trade-off problem in construction supply chain: A bi-level programming decision model
Author :
Jian-hua, Chen ; Wan, Tang
Author_Institution :
Sch. of Logistics Eng., Wuhan Univ. of Technol., Wuhan, China
fYear :
2010
fDate :
24-26 Nov. 2010
Firstpage :
212
Lastpage :
217
Abstract :
A time-cost trade-off problem to optimize net revenue is considered in this paper to discuss the impact of an incentive plan combined with a lump sum contract on the determination of a project´s optimal duration. A bi-level programming decision model is proposed in the viewpoint of the client to discuss the optimal selection of the revenue incentive intensity so as to harmonize the benefit between the client and the contractor and reach a certain equilibrium state. A heuristic algorithm is developed. Furthermore, the influence of some factors on this equilibrium state is analyzed through a numerical example. Results show that revenue-based incentive mechanism is effective in object and benefit coordinating between the two parties of construction supply chain.
Keywords :
construction industry; incentive schemes; mathematical programming; supply chain management; bilevel programming decision model; construction supply chain; incentive plan; net revenue; optimal duration; revenue incentive intensity; supply chain management; time-cost trade-off problem; Contracts; Decision making; Heuristic algorithms; Mathematical model; Optimization; Programming; Supply chains; bi-level programming; construction supply chain; incentive mechanism; revenue incentive; time-cost trade-off;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management Science and Engineering (ICMSE), 2010 International Conference on
Conference_Location :
Melbourne, VIC
ISSN :
2155-1847
Print_ISBN :
978-1-4244-8116-3
Type :
conf
DOI :
10.1109/ICMSE.2010.5719807
Filename :
5719807
Link To Document :
بازگشت