DocumentCode :
2602512
Title :
Direct database-simulation using PROGRESS
Author :
Koh, Kwang-Hang ; de Souza, Rausley Adriano Amaral ; Ho, Nai-Choon
Author_Institution :
Gintic Inst. of Manuf. Technol., Nanyang Technol. Univ., Singapore
fYear :
1995
fDate :
9-13 Apr 1995
Firstpage :
196
Lastpage :
200
Abstract :
The paper introduces a new concept called `direct database-simulation´ which uses relational database data as the simulation model for simulation-based scheduling in a job-shop environment. The application is in a large machine shop of 200 machining centres producing precision machine tools. The direct database-simulation scheduler was developed on PROGRESS (an application development environment centred on a relational database management system) to address the problem of finite capacity scheduling of the machine shop. It is shown that the concept is feasible and performance measures such as tardiness and machine utilisation are improved by an order of 20%
Keywords :
application generators; digital simulation; graphical user interfaces; machine tools; machining; production control; relational databases; PROGRESS; application development environment; direct database-simulation; finite capacity scheduling; job-shop environment; large machine shop; machine utilisation; machining centres; performance measures; precision machine tools; relational database data; simulation-based scheduling; tardiness; Graphical user interfaces; Job production systems; Job shop scheduling; Machine shops; Power system modeling; Predictive models; Production engineering; Pulp manufacturing; Relational databases; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Symposium, 1995., Proceedings of the 28th Annual
Conference_Location :
Phoenix, AZ
Print_ISBN :
0-8186-7091-6
Type :
conf
DOI :
10.1109/SIMSYM.1995.393580
Filename :
393580
Link To Document :
بازگشت