• DocumentCode
    2605902
  • Title

    Application and innovation of structured project breakdown technique in large-scale complex projects: A case study on 2010 Shanghai World Expo

  • Author

    Jian, Fang ; De-li, Yao ; Yong, Fu ; Sen-hao, Wang

  • Author_Institution
    Sch. of Econ. & Manage., Tongji Univ., Shanghai, China
  • fYear
    2010
  • fDate
    24-26 Nov. 2010
  • Firstpage
    1626
  • Lastpage
    1631
  • Abstract
    Structured management is an important management technique to decompose and synthesize large-scale complex projects. This article introduces the principles, the current research and connotation of structured management methods, based on which carries on specific study on project breakdown and proposes structured comprehensive breakdown method for large-scale complex projects. This article chooses 2010 Shanghai World Expo construction projects as the object of practical project breakdown, applies comprehensive breakdown method with overall concerns about a variety of factors in the whole process, and builds up a set of project breakdown structure that is applicable to all parties involved.
  • Keywords
    project management; 2010 Shanghai World Expo construction projects; large-scale complex projects; project breakdown structure; structured comprehensive breakdown; structured management; structured project breakdown; Decision making; Electric breakdown; Encoding; Joints; Organizations; Project management; Rivers; Shanghai Expo; comprehensive breakdown method; large-scale complex project; project breakdown structure; structured management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Engineering (ICMSE), 2010 International Conference on
  • Conference_Location
    Melbourne, VIC
  • ISSN
    2155-1847
  • Print_ISBN
    978-1-4244-8116-3
  • Type

    conf

  • DOI
    10.1109/ICMSE.2010.5720000
  • Filename
    5720000