• DocumentCode
    2606730
  • Title

    Instability analysis in MRP with tabu search

  • Author

    Zhang, J. ; Xie, J. ; Tan, Z. ; Jiang, Q. ; Xing, W.

  • Author_Institution
    Dept. of Appl. Math., Tsinghua Univ., Beijing, China
  • Volume
    2
  • fYear
    1997
  • fDate
    28-31 Oct 1997
  • Firstpage
    1371
  • Abstract
    Schedule instability (nervousness) analysis is a focal problem in material requirement planning (MRP) research. Tabu search (TS) is a good idea for solving combinatorial optimization problems. The study uses this idea in schedule instability analysis and proposes a new analysis method. To more accurately measure schedule instability, a new measurement of nervousness has also been proposed
  • Keywords
    manufacturing resources planning; production control; scheduling; search problems; stability; combinatorial optimization problems; material requirement planning; nervousness measurement; schedule instability analysis; schedule instability measurement; tabu search; Costs; Job shop scheduling; Lot sizing; Manufacturing; Materials requirements planning; Optimized production technology; Production planning; Stability; Stochastic systems; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Processing Systems, 1997. ICIPS '97. 1997 IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    0-7803-4253-4
  • Type

    conf

  • DOI
    10.1109/ICIPS.1997.669228
  • Filename
    669228