Title :
Instability analysis in MRP with tabu search
Author :
Zhang, J. ; Xie, J. ; Tan, Z. ; Jiang, Q. ; Xing, W.
Author_Institution :
Dept. of Appl. Math., Tsinghua Univ., Beijing, China
Abstract :
Schedule instability (nervousness) analysis is a focal problem in material requirement planning (MRP) research. Tabu search (TS) is a good idea for solving combinatorial optimization problems. The study uses this idea in schedule instability analysis and proposes a new analysis method. To more accurately measure schedule instability, a new measurement of nervousness has also been proposed
Keywords :
manufacturing resources planning; production control; scheduling; search problems; stability; combinatorial optimization problems; material requirement planning; nervousness measurement; schedule instability analysis; schedule instability measurement; tabu search; Costs; Job shop scheduling; Lot sizing; Manufacturing; Materials requirements planning; Optimized production technology; Production planning; Stability; Stochastic systems; Testing;
Conference_Titel :
Intelligent Processing Systems, 1997. ICIPS '97. 1997 IEEE International Conference on
Conference_Location :
Beijing
Print_ISBN :
0-7803-4253-4
DOI :
10.1109/ICIPS.1997.669228