DocumentCode
2607697
Title
Combination Operation for neutral point of 35kV grids in mountainous area
Author
Tao, Yuan ; Wen-xia, SiMa ; Rui, Ran
Author_Institution
State Key Lab. of Transm. & Distrib. Equip. & Power Syst. Safety & New Technol., Chongqing Univ., Chongqing
fYear
2008
fDate
9-12 Nov. 2008
Firstpage
273
Lastpage
276
Abstract
Based on a lot of measurement and analysis, This paper find that the unbalanced nature of 35 kV grids due to unsymmetrical capacity values gives difficulty in neutral point operation in mountainous area of west China. Improving compensation of suppressing coil can rectify imbalance of voltage but bring up new problem that suppressing coil can not extinguish grounding arc effectively in fault. To put down contradiction mentioned above, This paper proposes a new neutral point operation method as neutral point insulated in routine operation and suppressing coil grounding in fault, then EMTP simulation acts. Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids.
Keywords
arcs (electric); earthing; lightning protection; power grids; power system protection; EMTP simulation; West China mountainous area grids; grounding arc; lightning withstand level; neutral point insulation; power supply system; suppressing coil compensation; trip-out rate; voltage 35 kV; Coils; Displacement control; Fault currents; Grounding; Insulation; Power engineering and energy; Radio access networks; Substations; Testing; Voltage control; mountainous area 35kV grids unsymmetrical capacity values neutral point operation method;
fLanguage
English
Publisher
ieee
Conference_Titel
High Voltage Engineering and Application, 2008. ICHVE 2008. International Conference on
Conference_Location
Chongqing
Print_ISBN
978-1-4244-3823-5
Electronic_ISBN
978-1-4244-2810-6
Type
conf
DOI
10.1109/ICHVE.2008.4773926
Filename
4773926
Link To Document