DocumentCode :
2609405
Title :
Considering a cyclic multiple-part type three-machine robotic cell problem
Author :
Kamalabadi, I.N. ; Gholami, S. ; Mirzaei, A.H.
Author_Institution :
Univ. of Kurdistan, Sanandaj
fYear :
2007
fDate :
2-4 Dec. 2007
Firstpage :
704
Lastpage :
708
Abstract :
In this paper, we develop a new mathematical model for a cyclic multiple-part type three-machine robotic cell problem with assumption of S6 robot movement policy that minimises the cycle time. The developed model is based on Petri nets and provides a new method to calculate cycle times by considering waiting times. It was proved that calculating cycle time under S6 policy is unary NP-complete. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimisation tools is extremely difficult. In this paper we implement the particle swarm optimisation (PSO) algorithm for solving the problem. To validate the developed model and solution algorithm, various test problems are examined.
Keywords :
Petri nets; cellular manufacturing; control engineering computing; industrial robots; particle swarm optimisation; Petri nets; cyclic multiple-part type three-machine robotic cell problem; mathematical model; particle swarm optimisation; robot movement policy; Industrial engineering; Job shop scheduling; Manufacturing automation; Manufacturing industries; Materials handling; Mathematical model; Particle swarm optimization; Processor scheduling; Robotics and automation; Service robots; Cyclic blocking flow-shop; particle swarm optimisation; robotic cell; scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1529-8
Electronic_ISBN :
978-1-4244-1529-8
Type :
conf
DOI :
10.1109/IEEM.2007.4419281
Filename :
4419281
Link To Document :
بازگشت