Title :
Development of a new model for the flowshop problem
Author :
Mashhadi, M.M. ; Stafford, E.F. ; Tseng, F.T.
Author_Institution :
Univ. of Tehran, Tehran
Abstract :
A new mixed integer linear programming model for the regular flowshop scheduling problem is proposed in this paper. We show how the model is derived from an existing model mathematically. The new model has less number of constraints than the old model, whereas it has more number of variables. In an experimental design, the new model solves a class of problems in significantly less computational time than the existing model.
Keywords :
flow shop scheduling; integer programming; linear programming; flowshop problem; flowshop scheduling; mixed integer linear programming; Design for experiments; Fluid flow measurement; Job shop scheduling; Linear programming; Mathematical model; Mixed integer linear programming; Performance evaluation; Processor scheduling; Testing; Time measurement; Scheduling; integer programming;
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1529-8
Electronic_ISBN :
978-1-4244-1529-8
DOI :
10.1109/IEEM.2007.4419329