DocumentCode
2610437
Title
The assessment of bidding strategy of Iranian construction firm
Author
Esmaeeli, B. ; Ravanshadnia, M. ; Banki, M.T.
Author_Institution
Amirkabir Univ., Tehran
fYear
2007
fDate
2-4 Dec. 2007
Firstpage
984
Lastpage
988
Abstract
Arriving at the final bid price is a critical decision which is mostly done through experience and intuitions. As, many factors affect the final proposed price, no quantified decision processes may lead to irrational low or high proposed prices. Therefore, various attempts have been done to propose systematic models to track and analyze the bidding trends. This paper focuses on the previous trends of the bidding prices to estimate proper bidding cost in the Iranian construction industry The prices might be influenced by environmental characteristics such as competitors´ policies, the number of tendered projects, the number of contractors competing in the current tender, project characteristics, and the client. The subject of bidding price can be investigated through the client view or the contractor view. This paper attends the second approach. This paper present a quantitative analysis of impact of number of bidders on project bid prices. The study found that increasing the number of bidders will result in decreased project bid prices.
Keywords
construction industry; decision making; financial data processing; Iranian construction firm; bidding strategy; decision process; environmental characteristics; quantitative analysis; Books; Construction industry; Contracts; Costs; Engineering management; Environmental management; Europe; Pricing; Probability; Statistical analysis; Bidding strategy; number of bidders; statistical analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-1529-8
Electronic_ISBN
978-1-4244-1529-8
Type
conf
DOI
10.1109/IEEM.2007.4419339
Filename
4419339
Link To Document