DocumentCode
2610691
Title
Full Scope Real-Time Simulation of Hydropower Plant for a Training and Research Simulator
Author
Li, Xianshan ; Wu, Chengming ; Hu, Xiangyong
Author_Institution
Coll. of Electr. Eng. & Inf. Technol., China Three Gorges Univ., Hubei
fYear
2005
fDate
2005
Firstpage
1
Lastpage
5
Abstract
It is presented in this paper that the full scope real-time simulation model of a hydropower plant simulator for training and research should be developed whole plant, full process and whole zone of plant oriented. According to the structural characteristics of a large-scale hydropower plant, the full scope simulation model can be decomposed into several subsystems that can be calculated independently in every time step. Thus, the simulation time is reduced considerably. Examples are given to demonstrate the efficiency of this method
Keywords
hydroelectric power stations; power system simulation; full scope real-time simulation model; hydropower plant simulator; research simulator; simulation time reduction; structural characteristics; training simulator; Circuit simulation; Cities and towns; Computational modeling; Energy conversion; Hydroelectric power generation; Laboratories; Large-scale systems; Mathematical model; Nuclear power generation; Power generation; Hydroelectric power generation; Modeling; Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
Conference_Location
Dalian
Print_ISBN
0-7803-9114-4
Type
conf
DOI
10.1109/TDC.2005.1546767
Filename
1546767
Link To Document