• DocumentCode
    2610691
  • Title

    Full Scope Real-Time Simulation of Hydropower Plant for a Training and Research Simulator

  • Author

    Li, Xianshan ; Wu, Chengming ; Hu, Xiangyong

  • Author_Institution
    Coll. of Electr. Eng. & Inf. Technol., China Three Gorges Univ., Hubei
  • fYear
    2005
  • fDate
    2005
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    It is presented in this paper that the full scope real-time simulation model of a hydropower plant simulator for training and research should be developed whole plant, full process and whole zone of plant oriented. According to the structural characteristics of a large-scale hydropower plant, the full scope simulation model can be decomposed into several subsystems that can be calculated independently in every time step. Thus, the simulation time is reduced considerably. Examples are given to demonstrate the efficiency of this method
  • Keywords
    hydroelectric power stations; power system simulation; full scope real-time simulation model; hydropower plant simulator; research simulator; simulation time reduction; structural characteristics; training simulator; Circuit simulation; Cities and towns; Computational modeling; Energy conversion; Hydroelectric power generation; Laboratories; Large-scale systems; Mathematical model; Nuclear power generation; Power generation; Hydroelectric power generation; Modeling; Simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
  • Conference_Location
    Dalian
  • Print_ISBN
    0-7803-9114-4
  • Type

    conf

  • DOI
    10.1109/TDC.2005.1546767
  • Filename
    1546767