Applying critical chain in project scheduling and estimating buffer size based on fuzzy technique
Author :
Li, Kun ; Chen, Yun-xiang
Author_Institution :
Air Force Eng. Univ., Xi´´an
fYear :
2007
fDate :
2-4 Dec. 2007
Firstpage :
1068
Lastpage :
1072
Abstract :
Project scheduling has long been an area of intensive research. Aiming at the problems in the current Scheduling Management based on classical network scheduling techniques, this paper analyzes the principles of the theory of critical chain and the applications in project scheduling management, and discusses the principles of project buffer under the comparison of critical chain and classical network scheduling techniques. However, in the real world, project activities are subject to considerable uncertainty, which affects the performance of project scheduling management. A fuzzy method is researched to estimate the buffer size in critical chain scheduling to reduce the uncertainty degree. The test results indicate the evaluation based on fuzzy technique can improve the performance of project schedule. The future works are mentioned in the end.
Keywords :
fuzzy set theory; project management; scheduling; buffer size estimating; critical chain; critical chain scheduling; fuzzy technique; network scheduling techniques; project buffer; project scheduling; scheduling management; Constraint theory; Costs; Humans; Project management; Protection; Risk management; Stochastic processes; Testing; Uncertainty; Buffer; Critical chain; Fuzzy technique; Project scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1529-8
Electronic_ISBN :
978-1-4244-1529-8
Type :
conf
DOI :
10.1109/IEEM.2007.4419356
Filename :
4419356
Link To Document :
بازگشت