• DocumentCode
    2610812
  • Title

    TOC/DBR based production planning and control in a manufacturing system with multiple system bottlenecks

  • Author

    Guan, Z.L. ; Peng, Y.F. ; Yang, X.L. ; Shao, X.Y.

  • Author_Institution
    Huazhong Univ. of Sci. & Technol., Wuhan
  • fYear
    2007
  • fDate
    2-4 Dec. 2007
  • Firstpage
    1078
  • Lastpage
    1082
  • Abstract
    Bottleneck limits the throughput of a system, and multiple bottlenecks make the system harder to plan and control. In this paper, we propose a TOC/DBR based method for production planning and control when multiple bottlenecks exist. Especially, an algorithm for bottleneck scheduling with setup time is presented, and some simulation study has been carried out in an electronics manufacturing enterprise to validate its effect.
  • Keywords
    electronics industry; manufacturing systems; production control; production planning; scheduling; TOC/DBR based production planning; bottleneck scheduling; electronics manufacturing enterprise; manufacturing system; production control; system bottleneck; Control systems; Distributed Bragg reflectors; Job shop scheduling; Manufacturing systems; Materials requirements planning; Production planning; Scheduling algorithm; Throughput; Uncertainty; Virtual manufacturing; Multiple bottlenecks; TOC/DBR; production planning and control; scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-1529-8
  • Electronic_ISBN
    978-1-4244-1529-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2007.4419358
  • Filename
    4419358