DocumentCode :
2611602
Title :
A case study of obsolete part procurement process reengineering
Author :
Du, Jun ; Yuan-Yuan Jiao ; Jiao, Yuan-Yuan ; Kumar, Arun ; Ma, Maode
Author_Institution :
Nanyang Technol. Univ., Singapore
fYear :
2007
fDate :
2-4 Dec. 2007
Firstpage :
1337
Lastpage :
1341
Abstract :
Obsolete part procurement has to be inevitably dealt with especially in the electronic industry. Business process reengineering (BPR) has been adopted as an effective approach which can significantly improve performance of procurement process. BPR requires that there exist a fundamental and a proven, reliable methodology, which is generally applicable and repeatable. Towards this end, this paper presents the fundamentals and methodology of procurement process reengineering based on accountabilities and activities. Subsequently, Flextron which is a low volume and high mix electronic manufacturing service provider, is used as a case study to analyze obsolete part procurement process and implement procurement process reengineering for obsolete parts.
Keywords :
business process re-engineering; electronics industry; procurement; Flextron; business process reengineering; electronic industry; electronic manufacturing service provider; obsolete part procurement process reengineering; Acceleration; Aerospace engineering; Business process re-engineering; Companies; Engineering management; Manufacturing processes; Object oriented modeling; Process design; Procurement; Technology management; Procurement process; business process reengineering; obsolete part; simulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1528-1
Type :
conf
DOI :
10.1109/IEEM.2007.4419410
Filename :
4419410
Link To Document :
بازگشت