• DocumentCode
    26125
  • Title

    The Probability and Timing of Power System Restoration

  • Author

    Duffey, Romney B. ; Taesung Ha

  • Author_Institution
    Chalk River Labs., Atomic Energy of Canada Ltd., Chalk River, ON, Canada
  • Volume
    28
  • Issue
    1
  • fYear
    2013
  • fDate
    Feb. 2013
  • Firstpage
    3
  • Lastpage
    9
  • Abstract
    Power restoration following a large outage or widespread blackout is time critical and complex. A new method is presented for determining the timing and chance of electric power recovery and restoration. The present advance over previous work is explicitly integrating human, component and system reliability, which unifies the topic of power system restoration with the general theory for errors, accidents and outcomes for other technological systems.
  • Keywords
    power system reliability; power system restoration; probability; electric power recovery; power system restoration; probability; reliability; Error correction; Humans; Maintenance engineering; Power cables; Power system dynamics; Standards; Timing; Failure; learning; planning; power; probability; recovery;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2012.2203832
  • Filename
    6246657