DocumentCode :
2613667
Title :
Challenges of Using Partial Discharge Measurements for Predictive Maintenance
Author :
Abdel-Galil, T.K. ; Habiballah, I.O.
Author_Institution :
King Fahd Univ. of Pet. & Miner., Dhahran
fYear :
2005
fDate :
2005
Firstpage :
1
Lastpage :
6
Abstract :
This paper addresses the existing partial discharge (PD) measuring and detecting techniques which can be utilized by the utilities in their predictive maintenance programs. It also identifies the challenges which face utility engineers in collecting and analyzing partial discharge data. After addressing and highlighting these challenges, the paper discusses necessary research effort and methodologies to overcome these challenges
Keywords :
maintenance engineering; partial discharge measurement; partial discharge measurements; predictive maintenance; Acoustic signal detection; Face detection; Partial discharge measurement; Partial discharges; Petroleum; Phase measurement; Predictive maintenance; Pulse measurements; Shape measurement; Voltage; High voltage; partial discharge; predictive maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES
Conference_Location :
Dalian
Print_ISBN :
0-7803-9114-4
Type :
conf
DOI :
10.1109/TDC.2005.1546927
Filename :
1546927
Link To Document :
بازگشت