Live re-stringing of 138 kV lines
Author :
Gela, George ; Ferraro, Ray ; Verdecchio, Tom
fYear :
2000
fDate :
2000
Firstpage :
404
Lastpage :
409
Abstract :
This paper reports on research to develop new safe procedures for re-stringing an energized double-circuit 138 kV transmission line. The re-stringing operation requires the installation of a large stringing block and the removal, when necessary, of two insulator units from the string. This alters the worksite withstand characteristics significantly and lowers its insulation level. However, tests have shown that live working procedures could be developed for such a task, provided appropriate precautions are taken
Keywords :
impulse testing; insulators; maintenance engineering; power overhead lines; 138 kV; insulation level lowering; insulator units; live re-stringing; live working procedures; safe procedures; transmission line; worksite withstand characteristics; Circuit testing; Insulation; Poles and towers; Porcelain; Transmission lines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings. 2000 IEEE ESMO - 2000 IEEE 9th International Conference on
Conference_Location :
Montreal, Que.
Print_ISBN :
0-7803-6625-5
Type :
conf
DOI :
10.1109/TDCLLM.2000.882864
Filename :
882864
Link To Document :
بازگشت