DocumentCode
2619523
Title
Research of Multi-Resource Constrained Project Scheduling base on the genetic algorithm
Author
Wang, Rihong ; Xu, Ying ; Xin, Dandan
Author_Institution
Sch. of Comput. Eng., Qingdao Technol. Univ., Qingdao, China
fYear
2011
fDate
27-29 June 2011
Firstpage
2448
Lastpage
2450
Abstract
The software project scheduling is a complicated problem. The risk and the cost of the software project can be controlled well by a remarkable scheduling. In this paper, an optimization model for Multi-Resource Constrained Project Scheduling is presented to reduce the duration and the cost. A genetic algorithm Base on the Genetic Algorithm is proposed. It gives the method of two sections coding, the fitness_evaluating and the gene repair policy for tasks sequence constraint. The effectiveness of this algorithm is verified by the simulation results.
Keywords
genetic algorithms; project management; scheduling; software development management; fitness evaluating; gene repair policy; genetic algorithm; multiresource constrained project scheduling; optimization model; sections coding; software project scheduling; Genetic algorithms; Maintenance engineering; Optimization; Processor scheduling; Programming; Scheduling; Software; genetic algorithm; multi-constraint; scheduling; software development;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Service System (CSSS), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9762-1
Type
conf
DOI
10.1109/CSSS.2011.5974630
Filename
5974630
Link To Document