• DocumentCode
    2619523
  • Title

    Research of Multi-Resource Constrained Project Scheduling base on the genetic algorithm

  • Author

    Wang, Rihong ; Xu, Ying ; Xin, Dandan

  • Author_Institution
    Sch. of Comput. Eng., Qingdao Technol. Univ., Qingdao, China
  • fYear
    2011
  • fDate
    27-29 June 2011
  • Firstpage
    2448
  • Lastpage
    2450
  • Abstract
    The software project scheduling is a complicated problem. The risk and the cost of the software project can be controlled well by a remarkable scheduling. In this paper, an optimization model for Multi-Resource Constrained Project Scheduling is presented to reduce the duration and the cost. A genetic algorithm Base on the Genetic Algorithm is proposed. It gives the method of two sections coding, the fitness_evaluating and the gene repair policy for tasks sequence constraint. The effectiveness of this algorithm is verified by the simulation results.
  • Keywords
    genetic algorithms; project management; scheduling; software development management; fitness evaluating; gene repair policy; genetic algorithm; multiresource constrained project scheduling; optimization model; sections coding; software project scheduling; Genetic algorithms; Maintenance engineering; Optimization; Processor scheduling; Programming; Scheduling; Software; genetic algorithm; multi-constraint; scheduling; software development;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Science and Service System (CSSS), 2011 International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4244-9762-1
  • Type

    conf

  • DOI
    10.1109/CSSS.2011.5974630
  • Filename
    5974630