Research on the optimization of ERW pipe scheduling based on theory of constraints
Author :
Dong, Shaohua ; Hu, Junjie
Author_Institution :
Sch. of Mech. Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
fYear :
2011
fDate :
27-29 June 2011
Firstpage :
1656
Lastpage :
1658
Abstract :
In this paper, the bottleneck process in the production of Electric Resistance Weld pipe is identified and an optimal production plan model whit earliness and tardiness penalties is built. Based on the model, a genetic algorithm is designed. The computation results show the effectiveness of the model and the algorithm.
Keywords :
constraint theory; electric resistance; genetic algorithms; pipes; scheduling; welds; ERW pipe scheduling; constraint theory; electric resistance weld pipe production; genetic algorithm; optimal production plan model; optimization; Computational modeling; Job shop scheduling; Manufacturing; Mechanical engineering; Processor scheduling; Resistance; ERW Pipe; GA; Production Plan; Theory of Constraints;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Science and Service System (CSSS), 2011 International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-9762-1
Type :
conf
DOI :
10.1109/CSSS.2011.5974641
Filename :
5974641
Link To Document :
بازگشت