DocumentCode :
2622370
Title :
The challenge of regulatory compliance testing of a large distributed system
Author :
Braxton, Thomas E.
Author_Institution :
Lucent Technol., AT&T Bell Labs., Naperville, IL, USA
Volume :
2
fYear :
1998
fDate :
24-28 Aug 1998
Firstpage :
711
Abstract :
Though test procedures specified by standards bodies provide direction in the technical steps that are to be taken in performing a large-system EMC test, the management of such a project has not been widely discussed. In the case of a large distributed system, the organization, preparation and test execution become a logistical challenge. This paper reviews experience in performing such tests, provides observations on the planning process, and gives recommendations to regulatory engineers and developers who plan to perform an EMC test on a such a large scale
Keywords :
electromagnetic compatibility; legislation; project management; testing; EMC test; large distributed system; large-system EMC test; planning process observations; project management; regulatory compliance testing; regulatory engineers; standards bodies; Assembly; Circuit testing; Electromagnetic compatibility; FCC; Immune system; Large-scale systems; Performance evaluation; Process planning; Standards organizations; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electromagnetic Compatibility, 1998. 1998 IEEE International Symposium on
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-5015-4
Type :
conf
DOI :
10.1109/ISEMC.1998.750285
Filename :
750285
Link To Document :
بازگشت