Title : 
Rectifier design-project challenges
         
        
            Author : 
Rubinstein, Daniel
         
        
            Author_Institution : 
Comlo Pty Ltd., NSW, Australia
         
        
        
        
        
        
            Abstract : 
A telecom rectifier development process is presented from a project perspective looking at the conflicting and sometimes ambiguous requirements from a product in commercially realistic environment. An approach to mitigate the above drawbacks is presented
         
        
            Keywords : 
AC-DC power convertors; product development; rectifying circuits; telecommunication power supplies; commercially realistic environment; development process; product requirements; project challenges; rectifier design; telecommunication rectifier; Australia; Delay; Environmental management; Feedback loop; Market opportunities; Output feedback; Project management; Rectifiers; Telecommunications; Testing;
         
        
        
        
            Conference_Titel : 
Telecommunications Energy Conference, 2000. INTELEC. Twenty-second International
         
        
            Conference_Location : 
Phoenix, AZ
         
        
            Print_ISBN : 
0-7803-6407-4
         
        
        
            DOI : 
10.1109/INTLEC.2000.884261