Title :
Experience with the use of RCM in a transmission maintenance environment
Author_Institution :
Eskom, Johannesburg
Abstract :
New power system maintenance concepts and techniques are developed almost daily. There has been a major shift towards participation and teamwork with the ever increasing pressure towards more effective and efficient use of resources, a structured process of addressing the complex key issues regarding maintenance is therefore required. A shift towards reliability-centred maintenance (RCM) was thus almost inevitable. A controlled and structured approach is needed to change from a purely time based maintenance philosophy, to one that also considers usage and condition of equipment. This paper discusses the use of such a structured process, namely RCM, for analysing maintenance tasks, as applied in practice. The experience gained with two of a few projects in a transmission network operating and maintenance environment forms the basis of the discussion
Keywords :
maintenance engineering; power system reliability; project engineering; transmission networks; Eskom; South Africa; experience; participation; power system maintenance; projects; reliability-centred maintenance; structured process; teamwork; transmission network;
Conference_Titel :
Reliability of Transmission and Distribution Equipment, 1995., Second International Conference on the
Conference_Location :
Coventry
Print_ISBN :
0-85296-628-8
DOI :
10.1049/cp:19950241